Showing posts with label Clipper Creek. Show all posts
Showing posts with label Clipper Creek. Show all posts

Tuesday, February 1, 2011

TOU for EVs coming to Virginia!

Dominion Virginia Power Proposes Rate Options for Charging of Electric Vehicles

As reported earlier, Dominion Virginia Power is planning to rebid a new rate schedule for Electric Vehicles in the Commonwealth of Virginia later this year.  The proposal would go before the State Corporation Commission probably this spring and if accepted would mean that 1,500 lucky participants would be allowed to participate in the new rate on a 1-year, trial basis.

Dominion is considering 2 new rates for its residential customers.  One rate would be purely for Electric Vehicles and would have high on-peak and low off-peak usage charges.  The other would be a household rate similar to the Schedule 1T currently allowed to some Dominion customers, though at slightly higher rates.  As I'm currently happy with my household rate under Schedule 1, I'd still prefer the option for a separate TOU Meter, as stated previously.

Now, the question is, what will this new rate be?  According to the press release, Dominion expects a cost of 35¢ for a 40-mile commute under the Electric Vehicle only rate proposal.  This distance is significant because it is also the quoted electric range of the Chevrolet Volt.  Therefore, if we take battery capacity of the Chevy Volt and divide 35¢ by it, we should get the cost per kWh of the new off-peak rate.  The problem is, which value for the Chevy Volt did Dominion use in this computation?

Total battery capacity of the Chevy Volt is 16 kWh, but the Volt only has a usable range of 10.6 kWh.  What's more, Wikipedia quotes the EPA's calculated efficiency of 36 kWh⁄100 mi, or 2.78 mi⁄kWh.  Given each of these, the rate (for Generation and Transmission, combined) could be any one of 2.188¢⁄kWh over the entire 16 kWh battery pack, 3.365¢⁄kWh over the 10.6 kWh usable range of the pack or 2.431¢⁄kWh based on the EPA electrical rate of 36 kWh⁄100 mi for 40 miles totaling 14.4 kWh.

On the other hand, if the 40 mile range is based on the Nissan LEAF, then we know that the LEAF can go about 100 miles on its 24 kWh battery.  Thus, 40 miles represents 40% of 24 kWh or 9.6 kWh.  Divide the 35¢ quote from Dominion by this and you get 3.646¢⁄kWh.  As such, I'm inclined to believe the rate is closer to 3¢⁄kWh.  Either way, since my daily commute will be closer to 75 miles per day, I'd expect to be paying about 66¢ per day in Electricity under the new rate schedule, or about $4.59 per week.  Compare that to about $45 spent in gasoline each week and you can see why I want to go electric on this new rate schedule.

>Consider also that the 3¢⁄kWh is still half of the current summertime rate under Schedule 1, 7.033¢⁄kWh during the 4 summer months; 4.187¢⁄kWh the other 8 months.  What's not clear is if there'll be a separate $12 per month meter charge, in which case the rate becomes less appealing.

If we assume the new TOU rate for EVs will be 3¢⁄kWh for off-peak and the same as Schedule 1T, 13.977¢⁄kWh for on-peak, with a $12 per month charge for the second meter, my estimated annual cost for the EV's electricity will be about $327.42 per year.  Although this sounds good, I estimate my cost under the current Schedule 1 to be $311.07, which is actually cheaper!  This is mainly due to the monthly meter fee and the fact that the Clipper Creek CS-100 EVSE draws about 5 watts of power when idle, including during peak electricity hours.  If I could eliminate the monthly meter cost, my cost goes down to $183.42 annually; if I could shut off my EVSE during peak, that'd save a mere $3.09 if the Schedule 1T peak rate is used.

It also remains to be seen if a full 20+ kWh can be drawn for the entire 7 - 8 hours required to charge the Nissan LEAF under the new TOU EV rate. If the off-peak rate isn't a full 8 hours per night, it may be impossible to charge the LEAF without going on the peak usage rate.  In fact, if I hope to leave my house at 05:30 each morning, the off-peak better start absolutely no later than 22:00 — or the 2012 LEAF could just add a 6.6kW charger!

Of the 1500 participants in the pilot program, 750 will be chosen to go under the EV-only TOU rate and 750 to go to the household TOU rate for EV owners.  As the press release states, the program will begin 90 days after the State Corporation Commission approves the new rate and will end 30 November 2014.  Of course, if the new rate is approved in September, and I'm able to get my LEAF in December, I should be well-placed to join the pilot program.  If the approval comes earlier or my LEAF arrives later, I won't be able to get in the program from the beginning but might still be able to join as late as 1 December 2013, assuming there are still some opened slots in the program.  I would then be able to use this new rate for a year while Dominion closely monitored my electricity usage.

All in all, exciting news, even if it can't beat the current Schedule 1 rates, though this too may change as we learn more about the proposal. Stay tuned…

Wednesday, December 22, 2010

Clipper Creek CS-100 EVSE Installed!

For once, the awful photographer that I am, I have none the less decided to give you a pictorial retrospective of install of one of the first EVSEs in the Commonwealth of Virginia.  So with minimal textual interruption, here is my adventure into the world of Electric Vehicle Service Equipment — click any image for a larger version:

The Box

Wee!  A package for me!  From Clipper Creek?  I wonder what it could be?

EVSE Inside

Woo hoo!  The Clipper Creek CS-100 Electric Vehicle Service Equipment, complete with J1772 e-hose and Charger!

Inside the EVSE

Ah, a sneak peak into the interior of this industrial strength behemoth!

The 90A Converter

The heart of the machine: the 90 Ampère, 220 Volt A/C converter!  At least, so my dreamy eyes interpret the mysterious box in front of me.

J1772

Gonna pump me some serious electrons with this puppy: the J1772 standard Electric Vehicle charge plug.

Ready for Install

Aw, isn't she sweet — or he, all buff, industrial and military?  Nah, I like my ladies tough!  So there she is, all ready for her rough and ready install!

Add a Breaker

Ample room in the circuit breaker box for a new lead for my sub-panel.  And a bit of trivia: notice the blue sticker next to the 20 Ampère breaker?  The plugs it's connected to aren't NEMA 5-20R, plus the wiring didn't look a sufficient gauge for 20A.  So when I bought the house we told the former owner to downgrade that to a 15A breaker; I'm still waiting…

125A Breaker

Ta-da!  Joe, the kind Electrician from Cullen Electric, Inc. has added the first link in the power chain to my new EVSE: the 125 Ampère, 2-pole circuit breaker.

4-Wire 125A Aluminium

And here is the 4-wire 1/0 SER Aluminium cable at the beginning of its journey out to the sub panel in the garage.

Patched Roof

Yep, Joe warned me he would need to make a hole in my ceiling to run that thick wire across the house, but all in all, he did a pretty nice job of patching it back up, don't you think?  Just need to sand down the gauze mesh and repaint!

Second Patch

This one caught me a bit by surprise but it's small and I didn't even notice it until Joe pointed it out; I assume the wire got caught on its way to the utility closet so he had to fish it half-way through and anchor it there.

Run Wire in Utility Closet

Here the cable comes out into the utility closet (more of a utility room under the basement stairs, really)…

Run Wire up into wall

Then the chord goes out again and up into the garage wall.

Panel Mount with 4-Wire Aluminium coming out

We're back in the garage.  Joe is on his lunch break so I thought I'd take a sneak peak at the new sub-panel before he put the cover on it.  As you can see, the 4-wire 1/0 SER Aluminium cable comes to the end of its journey here.

Sub Panel Fully Installed

Time-lapse… the sub-panel is now fully installed with a new 3-wire 1/0 SER Aluminium cable coming out above on its way to the final leg of the electrical odyssey.

Sub Panel Has 1 Breaker

And what do we have inside?  Another 2-pole circuit breaker, this one with a 100 Ampère rating.  Can I just say, I'm probably learning way too much about Electrical Codes and Pricing and Wiring and Regulations than I probably ever remotely should?

It's 100A and for My EVSE

Yep, that's for my CS-100 EVSE.  Squee!  Also, can I just say, should an adult male of my experienced age really still be squeeing like a school girl?  Yes.

A Bit of Fire Board Caulk to Insulate

Okay, I have to give a shout-out here to my best friend from preschool, Tony, as well as the Fairfax County Electrical Inspector for reminding me of the virtues of good, fire-retardant caulk.  That's 3M Fire Barrier Sealant CP 25WB+, with 4-hour fire resistance, and it's red.

And the 3-Wire Exits My Sub Panel

Now we trace the 3-wire 1/0 SER Aluminium cable from out of the wall, toward the other side of my garage.  Notice the NEMA 5-15R on the far left for reference…

Across the Garage to the EVSE

Look, off to the left!  EVSE ho!  And of course, now on the far right, there's that same NEMA 5-15R to guide our way.

Hooks In Under the EVSE

My EVSE is receiving power from below thanks to Joe's fine work installing the 3-wire conduit to it.  The J1772 e-hose now sits lonely, waiting for an EV or Plug-in Hybrid to charge.  Nissan?  Chevy?  Ford Focus EV?  Mini-E?  Tesla?  Anyone??

And There's My EVSE Installed

Thank you Clipper Creek from one more happy, if untested, customer!

Finally, you may be wondering how much this cost.  Well, it wasn't cheap, but here's the breakdown:

Associations: $35.00

Materials: $3,272.05

  • $2550.00 (Clipper Creek CS-100 EVSE)
  • $267.30 (1/0 SER cable - 45 ft, 4-Wire Aluminum; from main panel to sub-panel)
  • $125.00 (125amp Siemans 2-pole 3 breaker)
  • $75.00 (100amp Siemans 2-pole 3 breaker)
  • $125.00 (16 space main lug panel with cover)
  • $64.75 (1/0 SEU cable - 25 ft, 3-Wire Aluminum; from sub-panel to EVSE)
  • $65.00 (Shop parts)

Shipping: $50.00

  • $50.00 (For the EVSE via UPS)

Labor: $680.00

  • $680.00 (Thanks again Joe!)

Permits: $250.00

  • $250.00 (Fairfax County, Virginia)

Taxes: $36.10

  • $36.10 (Northern Virginia Sales Tax at 5% on all materials but the EVSE itself)

Credits: ($2,000.00)

  • ($2,000.00) (EVSE Federal Tax Credit — Assuming no AMT in 2010)

Total cost to me: $2,323.15, assuming I qualify for the full EVSE Tax Credit and not get hit by AMT this year for the first time because of it.  Otherwise, it's a rather unpleasant $4,323.15 out-of-pocket with no money back and no return on investment for the next 12 or so months.

One question I still have is if I get a Smart Meter with TOU installed next year, as well as pay someone to fix the ceiling drywall, can I still qualify for the newly-passed 2011 EVSE 30% Tax Credit, capped at $1000.  I doubt the expenses that time would be anywhere near the maximum $3,333.33 for which the credit qualifies, but it doesn't hurt to ask.